Savings verified from real meter readings. No marketing maths.
The Headland Hotel

Hotels · Newquay, Cornwall

The Headland Hotel

Heating and hot water across a hotel, spa, Aqua Centre and holiday cottages. A full year of evidence, with weather and guest numbers included in the comparison.

The Headland Hotel
Reported reduction19%

Heating and hot water energy, adjusted for weather and occupancy.

Measurement period

A full year

Monthly comparisons with the same months of the previous year.

An individual OH4 installation result. This is not a forecast for your building.

Fitted around hotel life

The main hotel, spa and Aqua Centre plant was fitted in April 2024. Work across the 40 holiday cottages was phased around lettings, with 20 fitted that April and the remainder in November.

The published case study reports no downtime on heating or hot water during installation.

The evidence behind the result

How to read this result
Source dataMonthly energy consumption supplied by the hotel.
ComparisonEach month compared with the corresponding month of the previous year.
AdjustmentsDegree days for weather and guest numbers for occupancy. The source describes a kWh per degree day per guest comparison.
Published energy resultApproximately 515,000 kWh saved across a full year on the adjusted comparison.
Reported adjusted consumption2,709,597 kWh before and 2,194,773 kWh after.

Weather and occupancy adjustments are calculations applied to measured data. The result should be read with the report’s scope and method.

The client’s experience

“We were delighted with how non-invasive the installation was, with no disruption experienced to the hotel’s operation”

Richard Palmer, Director, The Headland Hotel

The full testimonial was written before the final twelve-month assessment and refers to an earlier result. The 19% shown here is the published full-year result.

Read the source

V1 Energy Solutions is a UK-based reseller of the OH4 Energy Saving System, working with clients worldwide. This published case study concerns an OH4 installation. The original report may name OH4 or its installation partner.

Review the period, included loads and adjustment method with your engineer before using this result in a business case.

Read the published case study (PDF)

Assess one hotel first

Discuss your heating, hot water, spa and occupancy data. Agree a measurement plan for one building before considering a wider rollout.

Request a free survey

Review the installation and measurement plan

Related evidence: The Georgian House Hotel · All case studies