1 Hotel Mayfair

Hotels · Mayfair, London

1 Hotel Mayfair

A central London hotel with substantial heating and hot water demand. The published comparison covers two months after an installation in January 2026.

1 Hotel Mayfair
Reported reduction16%

Weather-adjusted gas reduction. The unadjusted reduction was 17%.

Measurement period

Two months

March and April 2026 compared with the same period in the previous year.

An individual OH4 installation result. This is not a forecast for your building.

Fitted while the hotel operated

The OH4 system was fitted in the hotel’s plant room in January 2026. The published case study records four hours of installation, with no downtime on heating or hot water and no disruption to guests, spa or restaurant operations.

Measurement began in March, after the intervening month.

The evidence behind the result

How to read this result
Source dataThe hotel’s gas metering.
Assessment periodMarch and April 2026.
BaselineThe corresponding period in the previous year.
Unadjusted reduction17% across the two-month period.
Weather-adjusted reduction16%, following a degree-day adjustment for the marginally warmer comparison period.
Published adjusted consumption77,517 m³ before and 65,114 m³ after.

Two months of data are not a full-year assessment. The public summary states a weather adjustment; it does not describe an occupancy adjustment. Review guest numbers and other operational changes when assessing a hotel pilot.

Read the source

V1 Energy Solutions is a UK-based reseller of the OH4 Energy Saving System, working with clients worldwide. This published case study concerns an OH4 installation. The original report may name OH4 or its installation partner.

The reported percentages apply to March and April 2026 only. They have not been annualised here.

Read the published case study (PDF)

Assess your own hotel’s demand

Identify the heating and hot water meters and the operating information needed for a fair comparison. Start with a free survey, then agree a one-building pilot.

Request a free survey

Review the installation and measurement plan

Related evidence: Headland’s full-year case study · All case studies